A cookie is information stored on your computer by a website you visit. Cookies often store your settings for a website, such as your preferred language or location. This allows the site to present you with information customized to fit your needs. As per the GDPR law, companies need to get your explicit approval to collect your data. Some of these cookies are ‘strictly necessary’ to provide the basic functions of the website and can not be turned off, while others if present, have the option of being turned off. Learn more about our Privacy and Cookie policies. These can be managed also from our cookie policy page.
IE10 and below are not supported.
Contact us for any help on browser support
UPDATE: Read the latest update regarding our response to the novel coronavirus (COVID-19) situation. Read more.
Current City Works Permit Application(s) Consultations:
Flo Traffic Services and Load 28 : Full road closure of Melbourne Street between West Pallant Street and East Pallant Street.
We would like your feedback on an application for a City Works Permit from Flo Traffic Services and Load 28 for:
The full road closure of Melbourne Street between West Pallant Street and East Pallant Street to facilitate the Tower Crane Removal at 69 Melbourne Street on the following dates*
7.00 am Saturday 11 June 2022 to 7.00 pm Sunday 12 June 2022 .
(*in the event of unforeseen circumstances alternative commencement dates for the works are either 18 June 2022, 25 June 2022, 2 July 2022, 9 July 2022, 16 July 2022).
Click here to provide your submission.
Consultation Closes 5pm Wednesday 8 June 2022.
Flo Traffic Services and Load 28 : Full road closure of Waymouth Street between Bentham Street and King William Street.
We would like your feedback on an application for a City Works Permit from Flo Traffic Services and Load 28 for:
The full road closure of Waymouth Street between Bentham Street and King William Street to facilitate a crane lift on the following date*:
7.00am to 7.00pm Saturday 4 June 2022
(*in the event of unforeseen circumstances alternative commencement dates for the works are either 11 June, 18 June, 25 June, 2 July or 9 July 2022).
Click here to provide your submission.
Consultation Closes 5pm Wednesday 1 June 2022.
For updates on previous consultations click on the City Works Permits: Consultation Newsfeed Tabs below.
Background
Before granting an authorisation or permit, City of Adelaide is legislatively required under Section 223 of The Local Government Act 1999 (SA) to consult the public following receipt of an application for a City Works Permit for works 'that would result in any part of a road being fenced, enclosed or partitioned so as to impede the passage of traffic to a material degree'.
Current City Works Permit Application(s) Consultations:
Flo Traffic Services and Load 28 : Full road closure of Melbourne Street between West Pallant Street and East Pallant Street.
We would like your feedback on an application for a City Works Permit from Flo Traffic Services and Load 28 for:
The full road closure of Melbourne Street between West Pallant Street and East Pallant Street to facilitate the Tower Crane Removal at 69 Melbourne Street on the following dates*
7.00 am Saturday 11 June 2022 to 7.00 pm Sunday 12 June 2022 .
(*in the event of unforeseen circumstances alternative commencement dates for the works are either 18 June 2022, 25 June 2022, 2 July 2022, 9 July 2022, 16 July 2022).
Click here to provide your submission.
Consultation Closes 5pm Wednesday 8 June 2022.
Flo Traffic Services and Load 28 : Full road closure of Waymouth Street between Bentham Street and King William Street.
We would like your feedback on an application for a City Works Permit from Flo Traffic Services and Load 28 for:
The full road closure of Waymouth Street between Bentham Street and King William Street to facilitate a crane lift on the following date*:
7.00am to 7.00pm Saturday 4 June 2022
(*in the event of unforeseen circumstances alternative commencement dates for the works are either 11 June, 18 June, 25 June, 2 July or 9 July 2022).
Click here to provide your submission.
Consultation Closes 5pm Wednesday 1 June 2022.
For updates on previous consultations click on the City Works Permits: Consultation Newsfeed Tabs below.
Background
Before granting an authorisation or permit, City of Adelaide is legislatively required under Section 223 of The Local Government Act 1999 (SA) to consult the public following receipt of an application for a City Works Permit for works 'that would result in any part of a road being fenced, enclosed or partitioned so as to impede the passage of traffic to a material degree'.
Multiplex Constructions Pty Ltd: Full road closure of Pirie Street between Gawler Place and Wyatt Street
We sought your feedback on an application for a City Works Permit from Multiplex Constructions for:
The full road closure of Pirie Street between Gawler Place and Wyatt Street to facilitate dismantle of a grillage and gantry removal on the following dates*:
7.00am Saturday 30 April to 7.00pm Sunday 1 May 2022
7.00am Saturday 7 May to 7.00pm Sunday 8 May 2022
(*in the event of unforeseen circumstances alternative commencement dates for the works were 14, 21 or 28 May 2022).
Consultation Closed 5pm Wednesday 27 April 2022. PERMIT APPROVED.
Multiplex Constructions Pty Ltd - Full road closure of Pirie Street between Gawler Place and Wyatt Street
We sought your feedback on an application for a City Works Permit from Multiplex Constructions for:
The full road closure of Pirie Street between Gawler Place and Wyatt Street to facilitate the dismantle of two tower cranes on the following dates*:
7.00am Saturday 26 February to 7.00pm Sunday 27 February 2022
7.00am Saturday 26 March to 7.00pm Sunday 27 March 2022
7.00am Saturday 2 April to 7.00pm Sunday 3 April 2022
(*in the event of unforeseen circumstances alternative commencement dates for the works are either 5 March, 12 March, 19 March, 26 March, 2 April or 9 April 2022)
Click here to provide your submission.
Consultation Closed 5pm Wednesday 23 February 2022. PERMIT APPROVED. Works have been completed.
Synergy Construct - Road closure of westbound lanes of North Terrace between Pulteney Street and King William Street
We would like your feedback on an application for a City Works Permit from Synergy Construct for:
Road closure of westbound lanes of North Terrace between Pulteney Street and King William Street from 7.00am Saturday 20 November and 7.00pm Sunday 21 November 2021* to facilitate a tower crane dismantle.
(*in the event of unforeseen circumstances alternative commencement dates for the works are either 20 November 2021, 27 November 2021, 4 December 2021, 11 December 2021, 18 December 2021 or 8 January 2022).
Click here to provide your submission.
Consultation Closed 5pm Monday 15 November 2021. PERMIT APPROVED. WORKS COMPLETED
Synergy Construct - Part A, part road closure; Part B, full road closure of North Terrace and Frome Street, between North Terrace and Vaughan Place
We would like your feedback on an application for a City Works Permit from Synergy Construct for:
Part A: Partial road closure of westbound North Terrace and Frome Street, between North Terrace and Vaughan Place, from 7am *Monday 18 October 2021 to 7am Saturday 23 October 2021
and
Part B: Full road closure of westbound North Terrace and full road closure of Frome Street, between North Terrace and Vaughan Place, from 7am on *Saturday 23 October 2021 to 7pm Sunday 24 October 2021 to allow removal of crane towers.
(*in the event of unforeseen circumstances alternative commencement dates for the works are Part A: 25 October, 1 November, 8 November, 15 November, 22 November, 29 November, 6 December, or 13 December 2021 and Part B: 30 October, 6 November, 13 November, 20 November, 27 November, 4 December, 11 December or 18 December 2021).
Click here to provide your submission.
Consultation Closed 5pm Thursday 14 October 2021. PERMIT APPROVED. WORKS COMPLETED
Hindmarsh Construction - Full Closure of Brougham Place between O’Connell Street and Margaret Street South
We would like your feedback on an application for a City Works Permit from Hindmarsh Construction for:
The full road closure of Brougham Place between O’Connell Street and Margaret Street South from *Saturday 18 September 2021 6.00am to 7.00pm Monday 20 September 2021 to facilitate the tower crane dismantle.
(*in the event of unforeseen circumstances alternative commencement dates for the works are either 25 September, 2 October, 9 October, 16 October, 23 October, 30 October, 6 November, 13 November, 20 November, 27 November, 4 December, 11 December or 18 December 2021)
Click here to provide your submission.
Consultation Closed 5pm Thursday 16 September 2021.PERMIT APPROVED. WORKS COMPLETED
Watson Fitzgerald & Associates - Full Closure of southbound and part road closure of northbound King William Street between Currie Street and Waymouth Street
We would like your feedback on an application for a City Works Permit from Watson Fitzgerald & Associates for:
The full road closure of southbound and part road closure of northbound King William Street between Currie Street and Waymouth Street from 9.00pm *Saturday 21 August 2021 to 7.00pm Sunday 22 August 2021 to facilitate the installation of a crane.
(*in the event of unforeseen circumstances alternative commencement dates for the works are either 28 August 2021, 4 September 2021, 11 September 2021, 18 September 2021 or 25 September 2021)
Consultation closed 5pm, Wednesday 18 August 2021. PERMIT APPROVED. WORKS COMPLETED
The Tourist Australian Productions Pty Ltd - Full Closure of the eastern side of Hindmarsh Square.
We requested your feedback on an application for a City Works Permit from The Tourist Australian Productions Pty Ltd for:
The road closure on the eastern side of Hindmarsh Square between Grenfell Street and Pirie Street on *Monday 28 June 2021 from 5.00 am to 5.00 pm.
(*in the event of unforeseen circumstances, the alternative date for the filming is Monday 5 July 2021).
Consultation closed 5pm, Thursday 24 June 2021. PERMIT APPROVED. FILMING COMPLETED
Forme Projex – Part closure of Hurtle Square and Johns Lane for the installation of hoarding.
We requested feedback on an application for a City Works Permit from Forme Projex for:
The road closure of Hurtle Square between Pulteney Street and Johns Lane and a portion of road in Johns Lane adjacent to 421 Pulteney Street from Tuesday 8 June 2021 7.00 am to Wednesday 8 June 2022 5.00 pm for the installation of hoarding.
(*in the event of unforeseen circumstances alternative commencement dates for the works are either 26 June 2021 or 15 August 2021).
Consultation ran from 14 May 2021 to 9 am, Monday 7 June 2021. PERMIT APPROVED. WORK SCHEDULED FOR 25/06/2021 to 25/06/2022.
Brougham Marshall: Full Closure of Gunson Street for works at 266 -270 Pulteney Street from 7.00 am, Wed 11 March 2021 to 5.00pm Tuesday 31 May 2022*
(*in the event of unforeseen circumstances alternative commencement dates for the works are either 12, 13 or 15 March 2021).
Consultation was open from 12 Feb - 5 March 2021. PERMIT APPROVED. WORK COMPLETED
Multiplex Constructions PTY Ltd. The full road closure of Pirie Street between Gawler Place and Wyatt Street between 6.00 am Saturday to 7.00 pm Sunday to facilitate the staged installation of a tower crane on the following dates*:
(*in the event of unforeseen circumstances alternative commencement dates for the works are either 6 or 13 March 2021).
Consultation was open from 14 Jan - 3 Feb 2021. PERMIT APPROVED. WORK COMPLETED
Project Updates
Maxcon: Closure of Penny Place between Carrington Street and Seymour Place from Monday 16/11/2020 7.00 am to Friday 20/11/202 7.00 pm, with the road reopening each evening at 5 pm till 7.00 am the following morning *.
(*in the event of unforeseen circumstances alternative commencement dates for the works are either 23rd or 30th November 2020).
Consultation was open from 6 October to 5pm, Tuesday 27 October 2020. PERMIT APPROVED. WORK SCHEDULED FOR 16/11/20.
Synergy Construct: West bound closure of a section of North Terrace for the installation of bollards and hoarding (at 203 North Terrace) from 5.30am to 9.00 pm Wednesday 7 October 20*, followed by a full west-bound road closure each night from 9.00 pm until 5.30 am until Saturday 10th October 20 for the purpose of installing bollards and construction site hoardings at this site. The closure of this section of North Terrace will then revert to a full-time single west bound lane closure until 19 December 2021 to facilitate the major development at this location. Traffic management plans can be viewed in the information pack.
(*in the event of unforeseen circumstances contingency dates for the works are either 12 or 19 October 2020).
Consultation was open from 11 September to 5pm, Tuesday 6 October 2020. PERMIT APPROVED. WORK COMPLETED
Synergy Construct: Request to close section of North Terrace 4-5 October 2020. Consultation was open from 9 September to 30 September 2020. APPROVED
Workzone Traffic Control: Road closure of Brougham Place with a full road and footpath closure at 49 Brougham Place from 2pm, Friday 18 September to 7pm, Sunday 20 September 2020. Consultation was open from 14 August to 5pm, 4 September 2020.
Hindmarsh Constructions: Request to close Market Street from 1-2 August and 15 -16 August 2020:
For the dismantling and removal of the material hoist (1 -2 August 2020*) and facade completion works (15 -16 August 2020*).
(* in the event of unforeseen circumstances, the contingency dates for the works are: 8 August to 9 August 2020 and 22 August to 23 August 2020 respectively).
Consultation Period has closed. PERMIT GRANTED. WORK COMPLETED
Hindmarsh Constructions: Request to close Market Street on 11 July 2020:
The road closure of Market Street between Gouger Street and Wright Street, with full road and footpath closure at Hotel Indigo, 23-29 Market Street from 7am on Saturday, 11 July to 5pm on Sunday 12 July 2020*. (*in the event of unforeseen circumstances, the alternative commencement date for the works is 18th July 2020).
Consultation Period has closed. PERMIT GRANTED. WORK COMPLETED
Synergy Construct: Closure of Waymouth Street: 3 July 2020:
The road closure of Waymouth Street between Morphett Street and Young Street, with full road and footpath closure at UniLodge, 124 Waymouth Street from 7:00pm on Friday 3 July 20 until 7pm on Sunday 5 July 20. (*in the event of unforeseen circumstances alternative commencement dates for the works are from 10 July until 12 July 2020).
Hindmarsh Constructions: Request to close Market Street on 27 June 2020: Works postponed by applicant.
The road closure of Market Street between Gouger Street and Wright Street, with full road and footpath closure at Hotel Indigo, 23-29 Market Street from 7am on Saturday 27 June 2020 to 7pm on Sunday 28 June 2020*. (*in the event of unforeseen circumstances alternative commencement date for the works is 4 – 5 July 2020).
Consultation Period has closed. PERMIT GRANTED. WORK COMPLETED
Closure of Waymouth Street between King William Street and Young Street on 6 June 2020 on Saturday 6/6/2020 7.00am to 6.00pm*. (*in the event of unforeseen circumstances alternative commencement dates for the works are either 13, 20 or 27 June 2020).
Consultation Period has closed. PERMIT GRANTED. WORK COMPLETED
The road closure of Hurtle Square between Pope Street and Carrington Street, with full road and footpath closure on Hurtle Square (north/south direction) at 22-26 Hurtle Square on Tuesday 31/03/2020 from 7.00 am to 7.00 pm Tuesday 7/07/2020. APPROVED.
*Please note*: the proposed dates for works in Hurtle Square by Forme Contracting, which had been recently amended to the new dates specified below, have now been delayed until further notice due to the COVID-19 situation. As such, Forme Contracting requested a cancellation of their current permit application and they will reapply for the road closure permit once they have new firm dates established.
The road closure of Frome Street between Rundle Street and North Terrace, with a single westbound lane closure on North Terrace (westerly direction) from Frome Road to 263 North Terrace from 6pm, Saturday 28 March 2020 to 7.00 pm Sunday 29 March 2020.
Consultation Period has closed. Permit approved; works proceeded on Saturday 28/03/2020 and Sunday 29/03/2020.
The road closure of Waymouth Street from Young Street towards the intersection of Light Square with Waymouth Street from *7pm, Friday 17 April 2020 to 5pm, 19 April 2020. (*in the event of unforeseen circumstances, alternative dates for works are 7pm, Friday 24 April 2020 to 5pm, 26 April 2020 or 7pm, 1 May 2020 to 5pm, 3 May 2020)
Consultation opens 21 February 2020 and closes 5.00 pm, Friday 13 March 2020.
Permit approved; works yet to commence.
Synergy Construct: The road closure of Frome Street between Rundle Street and North Terrace, with a single westbound lane closure on North Terrace (westerly direction) from Frome Road to 263 North Terrace on Tuesday 10/03/2020 from 7.00 pm to 8.00 am.
Consultation occurred between 12 February 2020 and 4 March 2020. Permit Approved and issued. Works yet to commence.
Traffic Group Australia: The closure of Pirie Street between King William Street and Gawler Place between 7.00 am and 7.00 pm on Saturday, 7 March 2020. Consultation occurred 7 - 28 February 2020. Permit approved and works proceeded on 07/03/2020.
Consultation occurred 7 - 28 February 2020. Permit approved and works proceeded on 07/03/2020.
Maxcon Construction: The partial road closure of Pulteney Street between North Terrace and Rundle Street 7 -8 February 2020. Permit approved and works completed.
Consultation occurred 14 January - 5 February 2020.
Traffic Group Australia: Road closure of Pulteney Street between North Terrace and Grenfell Street 1- 3 February 2020.
Consultation occurred 7 - 28 January 2020. Permit approved and works proceeded on 01-03 Feb 2020.
Project | Consultation period | Status |
Kyren Group: The partial road closure of Frome Street between North Terrace and Rundle Street | 17 December 2019 - 5.00 pm, 7 January 2020 |
Permit approved. |
Synergy Construction: for the removal of the right-hand turn on Frome Road, for the northern bound lane at the intersection of Frome Road and North Terrace. | 2 December 2019 - 5.00 pm, 23 December 2019 |
Permit approved. |
AGL & Son Crane Hire: for the closure of South Terrace between Morphett Street and King William Street. | 2 December 2019 - 5.00 pm, 23 December 2019 |
Permit approved. works have been completed. |
Street from 2 December 2019 to 20 December 2020 | 7 November - 28 November 2019 | |
Hindmarsh Construction: Closure of Morphett Street between Currie St and Waymouth St, 7 December 2019. | 7 November - 28 November 2019 | Permit approved. Works have been completed. |
Traffic Group Australia: Closure of King William Street between North Terrace and Hindley Street | To be confirmed |
This has been Cancelled – works did not go ahead. |
AGL & Son: Closure of South Terrace between Morphett Street and King William Street |
22 October 2019 - 5.00 pm, 12 November 2019 |
Permit approved. Works have completed and then went back to public consultation. |
Savills Project Services: Closure of South Terrace from 248 -260 for works at 252 South Terrace. | 16 October 2019 - 5.00 pm, 6 November 2019 |
Permit approved - works completed |
Traffic Group Australia: Closure of Gouger Street between King William and Morphett Street and reducing Grote St to one lane on 16 November 2019. | 2 October - 23 October 2019 | Permits approved |
Hindmarsh Construct: The road closure of Pirie Street directly in front of 293 - 297 Pirie Street from 12am *12 October 2019 to 12 am 13 October 2019. |
26 August 2019 to 5pm, 16 September 2019. |
Permit approved. Works have been completed. |
Traffic Group Australia: The road closure of North Terrace (east bound only) for works at the Adelaide Casino from 5am – 6pm *18 August 2019, and 5am – 6pm *31 August 2019. |
22 July 2019 - 5pm, 12 August 2019. |
Permits approved |
Synergy: 124 Waymouth Street (closure of Tatham st; Cannon St and Eliza St: 12 July - 14 July 2019. |
19 June - 10 July 2019 | Permit approved |
Traffic Group Australia: Part closure Franklin St from 21 June - 23 June 2019 |
29 May - 19 June 2019 | Permit approved |
Minuzzo: Closure of East Tce at 217 East Tce from 10 May 19 - 28 March 2020 |
18 April - 9 May 2019 | Project reconfigured: Road remained open |
Hindmarsh Constructions: Closure of Market St from 30 March - 31 March 2019. |
6 March - 27 March 2019 | Permit approved |
Built Environs: Wingfold Tower: Part closure of Waymouth St from 16 March - 17 March 2019. |
13 February - 14 March 2019 | Permit approved |
Built: Part closure of Franklin St from 22 March - 24 March 2019 |
27 February - 20 March 2019 | Permit approved |
Built Environs: 116 Waymouth St: Installation of construction hoarding requiring Playhouse Lane to become one-way | 13 February - 6 March 2019 | Permit approved |
Synergy Construct: Toms Court: installation of construction hoarding |
6 February - 27 February 2019 |
Permit was approved and works have been completed. |
John Holland: Road closure of Pulteney Street between Angas and Wakefield Street on 18/1/2019 from 9.00 am to 4.00pm and from 3.00am 19/1/2019 to 3.00am 21/01/2019. |
20 December 2018 - 9 January 2019 | Permit Approved |
Forme Contracting: Road closure at the intersection of Halifax Street and Hurtle Square on 15 January 2019 from 7.00am to 4.30pm. |
20 December 2018 - 9 January 2019 |
Permit Approved |
|
|
Project | Consultation period | Status |
John Holland: Construction works: Hurtle St and Pulteney St |
19 December 2018 - 9 January 2019 |
Permit Approved |
Synergy Construct: Closure Gray St from 10 December to 20 December 2018 | 10 October - 31 October 2018 |
Permit approved: work was pushed back to 25 March and 3 April 2019. |
Maxcon Constructs: Part Closure of Austin Street: 17 November 2018 | 10 October - 31 October 2018 |
Permit Approved |
Palumbo PTY Ltd: Part closure: Currie St. 1 Sept - 1 Dec 2018 | 1 August - 22 August 2018 | Permit Approved. |
Cesar Federici: Partial road closure: Waymouth Street: Aug 2018. |
18 July - 8 August 2018 | Permit Approved |